Every job here is a clock somebody else started

DANMAREVM LTD is registered for two kinds of work out of one base in Felixstowe: carrying goods by road, and specialised construction on other people's sites. Both are measured the same way: a vehicle is booked into a window, the clock starts at the gate and stops on release. On a dig it runs over the trench instead, held by whoever controls the ground.

SIC 49410 — freight transport by road

Goods moved for somebody else, into somebody else's window.

SIC 43999 — other specialised construction

Work on a site that is not ours, inside its permitted hours.

An articulated trailer backed onto a bay at Felixstowe before dawn, dock cranes on the horizon.
The yard, before the first window opens

Who starts the clock

Not this company. A box comes off a ship on the terminal's crane onto its apron, and a vehicle gets an hour to take it away. Everything below happens in that hour.

The quay in elevation, with the clock being handed over A side view along a quay. At the left a ship lies in the water with boxes on deck. A portal crane straddles the apron, a box hanging from its trolley above a landed stack. A rigid vehicle waits between the crane legs. At the right, a dashed line between two posts is the gate. their ship their crane their apron the gate ours, and called forward when the hour opens boxes landed before anyone rings us
  • Quay and apron
  • Boxes on the terminal
  • The only vehicle that is ours
  • Where the clock stops
A drawn elevation — not a photograph of any quay, crane or vehicle this company owns. A haulier brings one thing: a vehicle loadable in one movement.

Two clocks, drawn to one width

Neither clock is ours. On the road the drivers' hours rules cut the day; on a site the permit does. Both are drawn to one width.

A day cut by the hours rules

Drive, other work, break, rest
A tachograph trace for one driving day A stylus line crosses a twelve-hour axis from six in the morning: up to the driving row for four and a half hours, down to rest for a forty-five minute break, up for two hours, across the other-work row for forty-five minutes, then up for a final two and a half. The daily limit line above it ends where the trace does, at five in the afternoon. Drive Work Rest Limit — 9 h 00 driving Trace stops 17:00 06 08 10 12 14 16 18 hours of the day
An illustrative trace, nobody's actual day. Solid blocks are driving, hatched other work, a gap a break. The driving adds to nine hours exactly, so limit line and trace stop together.

A day cut by the permit

Gate, tipping window, noise hours
Three lanes of a site day Three horizontal lanes across a twelve-hour axis from seven in the morning. The top lane is when work is permitted at the gate, broken at midday and tailing into a quiet clear-down. The middle lane holds two tipping windows, late morning and mid afternoon. The bottom lane is the shorter span for noisy work. Gate open — work permitted working working A vehicle can tip 09:30–11:00 14:00–15:30 Noisy work permitted 07 09 11 13 15 17 19
An illustrative site day, not a timetable we set. The lanes rarely line up: a vehicle can be inside the gate and still wait to tip.
An opened excavation in a road, plated and barriered, the arisings heaped on a sheet.
A dig, opened and sheeted

Booked into the window

Two kinds of work are booked into windows at one gate, so a booking says which it is.

Road haulage

Booked by class, not by vehicle

Palletised

Standard and Euro pallets, wrapped by the sender, counted on against the note, off against a signature.

Loose and boxed

Crates, drums and framed panels that will not sit on a pallet. Handball is agreed at booking.

Plant and site kit

Small plant, formwork, bagged aggregate and pipe, strapped to a plan written before the ramps drop.

Site works

Priced to a drawing and a method

Hardstanding and yard surfaces

Formation, sub-base, edge restraint and falls to a drawing, so water leaves the slab where it says.

Cutting and breaking

Saw cuts, chases and openings in concrete, dust and slurry controlled at the blade.

Drainage and service trenches

Trench, bed, lay, surround, reinstate — dug to a permit once services are marked.

In hand before the clock starts

What must be in hand before work begins, what each settles, who signs it.
Document What it settles Signed by
In the cab — road haulage
Delivery note How many of what went out, and how many arrived. Receiver, against the count
Consignment note That the goods, not the vehicle, are what is being carried. Sender at collection
Weighbridge ticket Gross, tare and net, where a load is sold by weight. Weighbridge operator
Walkaround check That defects were found before the first movement. Driver, before moving
In the site hut — site works
Risk assessment and method statement The order of work, the plant, and what was done about the parts that can hurt. Supervisor and crew
Permit to dig That the ground was traced before a blade went in. Whoever controls the ground
Waste transfer note That arisings left lawfully, named, with a carrier and destination. Carrier and receiver
Inspection and pour sign-off Levels and cover, written on the day they were covered up. Site engineer

Gate in, gate out

A window is not a promise that the queue will be short.

A lorry's hours follow the driver: they run whoever the load belongs to, they do not pause at anybody's gate, and an hour waiting is an hour spent. A site's hours follow the site, and bind every crew on it.

One turn, gate to gate A closed circuit drawn as a tall rounded rectangle, broken on its left side at the gate. Seven numbered stations sit on it and are named alongside: gate in, queue, called forward, loaded, pins and lashings, weighed, gate out. Three small vehicles wait inside the loop at the queue. A thick line covers the whole circuit, which is the part spent inside the gate. 1 2 3 4 5 6 7 1  Gate in — the clock starts here 2  Queue, with the shift running 3  Called forward to the stack 4  Loaded in one movement 5  Pins and lashings on 6  Weighed, and the ticket taken 7  Gate out — the clock stops gate to gate — the whole of the turn
A drawn circuit, not a timed study. Every station on it is inside somebody else's gate, which is what the thick line covers. The booking that issued the window happened days earlier.
The empty cab of a lorry at the end of a shift, clipboard on the seat, yard beyond.
End of a shift

Two sums done while the engine idles

Both are worked before the keys turn: has the driver hours left, and has the vehicle the payload.

Drivers' hours planner

Which limit bites first
Minutes left before a limit bites
Arithmetic on the figures above, in this browser
The three limits it works against
  • Driving before a 45-minute break is due4 h 30
  • Driving in one day9 h 00
  • First duty to last13 h 00

Load-weight check

Payload against the plated weight
Payload available against payload used
Gross against unladen; axle limits come off the vehicle
How the sum is made
  • Payload availableplated − unladen
  • Payload usedpallets × weight each
  • Marginavailable − used

What the turn is run with, and what it leaves

Some stands in the yard; the rest arrives on hire. What a site turn leaves is drawn first: it has to be right before it disappears.

A service trench in section, opened and reinstated A cut through a road at a service trench. The existing surface and sub-base run in from both sides to two saw cuts. Between them, bottom upwards: bedding, a pipe in its surround, warning tape, three compacted backfill layers, sub-base, reinstated surface. Brackets give the cover to the pipe and the opened width. Arisings sit beside the cut. opened width — no wider than the work needs cover to the pipe arisings leave under a transfer note existing bound surface existing sub-base reinstated to match compacted in layers pipe in its surround bedding undisturbed formation
A drawn section, not a specification. Layers go in and are compacted bottom first, with warning tape above the pipe for whoever opens the ground next.
Haulage

Rigid

Where the address decides it: narrow approaches, timed streets, no turning room.

Decided by
Access, not tonnage
Haulage

Artic and drawbar

Where the pallet count decides it and the far end has a dock.

Decided by
Pallet count and headroom
Site works

Hired-in plant

Excavators, breakers, saws and pumps arrive with the hirer's inspection report.

Checked on arrival
Report, guards, hoses
Site works

Materials staging

Aggregate, pipe and bedding are staged so a site gets one delivery in its window.

Staged against
The site's tipping window

Starting a turn

One address takes both, so the subject line does the sorting.

To start a haulage turn

  1. 1Both postcodesCollection and delivery, and each end's window.
  2. 2What it isHow many pallets or pieces, and the weight if known.
  3. 3What is at each endA dock, a forklift, or neither.

Write to loads@danmarevm.online with those three and a date.

Subject: LOAD — IP11 to NR30, 8 pallets

To start a site turn

  1. 1Site and drawingThe site postcode, and the drawing if one exists.
  2. 2Who holds the dutiesWho is principal contractor there.
  3. 3When it can take a crewThe dates it can receive people and a delivery.

Same address; say in the first line that it is site works.

Subject: SITE WORKS — IP11, trench and reinstate

Scope is confirmed in writing Incorporated on 30th August 2026. Nothing here is a claim to hold any particular operating authority, qualification or accreditation.