Felixstowe, Suffolk · incorporated 30th August 2026
Every job here is a clock somebody else started
DANMAREVM LTD is registered for two kinds of work out of one base in Felixstowe: carrying goods by road, and specialised construction on other people's sites. Both are measured the same way: a vehicle is booked into a window, the clock starts at the gate and stops on release. On a dig it runs over the trench instead, held by whoever controls the ground.
SIC 49410 — freight transport by road
Goods moved for somebody else, into somebody else's window.
SIC 43999 — other specialised construction
Work on a site that is not ours, inside its permitted hours.
Who starts the clock
Not this company. A box comes off a ship on the terminal's crane onto its apron, and a vehicle gets an hour to take it away. Everything below happens in that hour.
- Quay and apron
- Boxes on the terminal
- The only vehicle that is ours
- Where the clock stops
Two clocks, drawn to one width
Neither clock is ours. On the road the drivers' hours rules cut the day; on a site the permit does. Both are drawn to one width.
A day cut by the permit
Gate, tipping window, noise hours
Booked into the window
Two kinds of work are booked into windows at one gate, so a booking says which it is.
Road haulage
Booked by class, not by vehiclePalletised
Standard and Euro pallets, wrapped by the sender, counted on against the note, off against a signature.
Loose and boxed
Crates, drums and framed panels that will not sit on a pallet. Handball is agreed at booking.
Plant and site kit
Small plant, formwork, bagged aggregate and pipe, strapped to a plan written before the ramps drop.
Site works
Priced to a drawing and a methodHardstanding and yard surfaces
Formation, sub-base, edge restraint and falls to a drawing, so water leaves the slab where it says.
Cutting and breaking
Saw cuts, chases and openings in concrete, dust and slurry controlled at the blade.
Drainage and service trenches
Trench, bed, lay, surround, reinstate — dug to a permit once services are marked.
In hand before the clock starts
| Document | What it settles | Signed by |
|---|---|---|
| In the cab — road haulage | ||
| Delivery note | How many of what went out, and how many arrived. | Receiver, against the count |
| Consignment note | That the goods, not the vehicle, are what is being carried. | Sender at collection |
| Weighbridge ticket | Gross, tare and net, where a load is sold by weight. | Weighbridge operator |
| Walkaround check | That defects were found before the first movement. | Driver, before moving |
| In the site hut — site works | ||
| Risk assessment and method statement | The order of work, the plant, and what was done about the parts that can hurt. | Supervisor and crew |
| Permit to dig | That the ground was traced before a blade went in. | Whoever controls the ground |
| Waste transfer note | That arisings left lawfully, named, with a carrier and destination. | Carrier and receiver |
| Inspection and pour sign-off | Levels and cover, written on the day they were covered up. | Site engineer |
Gate in, gate out
A window is not a promise that the queue will be short.
A lorry's hours follow the driver: they run whoever the load belongs to, they do not pause at anybody's gate, and an hour waiting is an hour spent. A site's hours follow the site, and bind every crew on it.
Two sums done while the engine idles
Both are worked before the keys turn: has the driver hours left, and has the vehicle the payload.
Drivers' hours planner
Which limit bites first- Driving before a 45-minute break is due4 h 30
- Driving in one day9 h 00
- First duty to last13 h 00
Load-weight check
Payload against the plated weight- Payload availableplated − unladen
- Payload usedpallets × weight each
- Marginavailable − used
What the turn is run with, and what it leaves
Some stands in the yard; the rest arrives on hire. What a site turn leaves is drawn first: it has to be right before it disappears.
Rigid
Where the address decides it: narrow approaches, timed streets, no turning room.
- Decided by
- Access, not tonnage
Artic and drawbar
Where the pallet count decides it and the far end has a dock.
- Decided by
- Pallet count and headroom
Hired-in plant
Excavators, breakers, saws and pumps arrive with the hirer's inspection report.
- Checked on arrival
- Report, guards, hoses
Materials staging
Aggregate, pipe and bedding are staged so a site gets one delivery in its window.
- Staged against
- The site's tipping window
Starting a turn
One address takes both, so the subject line does the sorting.
To start a haulage turn
- 1Both postcodesCollection and delivery, and each end's window.
- 2What it isHow many pallets or pieces, and the weight if known.
- 3What is at each endA dock, a forklift, or neither.
Write to loads@danmarevm.online with those three and a date.
Subject: LOAD — IP11 to NR30, 8 pallets
To start a site turn
- 1Site and drawingThe site postcode, and the drawing if one exists.
- 2Who holds the dutiesWho is principal contractor there.
- 3When it can take a crewThe dates it can receive people and a delivery.
Same address; say in the first line that it is site works.
Subject: SITE WORKS — IP11, trench and reinstate